Serving: Calhoun, Jackson, Pleasants, Ritchie, Roane, Tyler, Wirt, Wood Counties in West Virginia

June 22, 2017 | May 10, 2017 | March 15, 2017 | January 24, 2017 | December 21, 2016 | September 28, 2016 | May 11, 2016 | March 16, 2016 | December 16, 2015 | September 23, 2015 | August 27, 2015

The following amendments to the 2016-2019 Transportation Improvement Program will be made following a phone vote of the WWW Board on June 22, 2017.
 

West Virginia New TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

S354-31-3.49 00
STP-0031(051)D
WV 31 (Deerwalk Highway): Resurfacing project (3.31 miles) from US 50 to CR 2/1 (Bull Run).
 
$875,000
 
 Construction
FY 2018.

 

WV TIP Projects (Administrative Adjustments)

Project #

Project Description

Total Project Cost

Schedule

U399-SPT/SB-1.00
SB-11WV(008)D
Staunton-Parkersburg Turnpike wayfinding. Scenic Byways project. Includes design and construction of parking and signage at various spot locations.

 

$80,000

Construction phase moved from FY 2017 to FY 2018.
U383-NORTH-1.00
NRT-2015(242)D
North Bend Rail Trail: Install comfort stations (restrooms) at one location in Wood County.
 
$38,200

Project moved from FY 16 to FY 17.
 
U354-PAR/KE-13.00
TEA-2014(107)D

 
Parkersburg – Construct Ohio River Trail from Point Park to Memorial Bridge. Includes construction of pedestrian bridge over Pond Run.
 
$350,000

Construction phase moved from FY 2019 to FY 2017.


 
S354-618-0.43 00
ACST-0618(001)

 
WV 618 (Old US 50) – 2.23 miles of resurfacing from WV 68 (Murdoch Ave./Ann Street) to WV 14 Alt. (East Street).
 
$1,500,000

Construction phase moved from FY 2018 to FY 2017.
U354-FRA/NK-1.00
SRTS-2012(661)D

 
Parkersburg: Franklin Elementary School, Safe Routes to School project. Includes sidewalk construction and crosswalks from 19th Street to Stewart Street.
 
$85,000

Construction phase moved from FY 2017 to FY 2018.
U354-WIL/LI-5.02
TEA-2012(646)D

 
Williamstown sidewalk improvements from West 9th Street to East 9th Street.

 
$212,500

Construction phase moved to FY 2017.
 
U354-MOUNT-2.00
NRT-2015(248)D

 
Mountwood Park ATV trail – Project to include trail improvements and rest area.

 
$124,362

Construction phase moved from FY 2017 to FY 2018.
 
X354-D-7.00 12
NHPP-0282(145)D

 
US 50 Corridor D – Seeding, mulching, and bank stabilization from WV 47 to the Blennerhassett Bridge.
 
$2,400,000

Construction phase moved from FY 2017 to FY 2018.
 
U354-VIE/NN-1.00
TAP-2014(213)D
WV 14: Vienna Streetscaping project along Grand Central Avenue from 25th Street to 30th Street. Includes sidewalk improvements, curbing, benches, decorative lighting, and landscaping.
 
$124,881

Construction phase moved from FY 2017 to FY 2019.
T654-31-19.04 00
STP-0031(044)D
WV 31: Williamstown/Marietta Bridge – Six-year inspection.
 
$625,000

Engineering phase moved from Fiscal Year 2017 to Fiscal Year 2019.
 

The following amendments to the 2016-2019 Transportation Improvement Program were made following a meeting of the WWW Board on May 10, 2017.
 

West Virginia New TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

S354-14-3.41 00
ACST-0014(164)D
WV 14 – Resurface 2.93 miles of WV 14 through Mineral Wells from 0.10   miles north of CR 14/5 to 0.12 miles south of the CR 14/1.    
 
$850,000
 
Project Deleted

No federal funds used on the project.

 

S354-618-1.70 00
ACST-618(002)D
WV 618 – Resurface 1.72 miles of WV 618 from the junction of WV 14 Alt.   (East St.) to the Junction of US 50.
 
$1,500,000 Project Deleted

No federal funds used on the project.

WV TIP Projects (Administrative Adjustments)

Project #

Project Description

Project Cost and Revision
U354-2-27.56 00
HSIP-0002(570)D
WV 2 – Corbitt Hill Road: Install left turn lane at the junction of WV 2 and CR 2/16.

 

$600,000

Project moved from FY 2017 to FY 2018.
S354-14-1.00
STP-0014(167)D
WV 14 – Resurface 1.35 miles from the junction of WV 14 Alt. to the Junction of WV 95.
 
$428,000

Added federal funds into the project ($342,400). Revised federal project number to reflect STP funds.
 

 

The following amendments to the 2016-2019 Transportation Improvement Program were made following a meeting of the WWW Board on March 15, 2017.
 

West Virginia New TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

U354-RAYON-1 00

TAP-2016(327)DTC

TAP-2016(328)D

Design and construct approximately 2,400 linear feet of new and replacement sidewalk along the northern side of Rayon Drive between Pike Street and 12th Avenue. The project to include curbs, ADA handicap ramps and drainage improvements.
 
$300,000

Engineering
$75,000
Construction
$225,000

 

Engineering

FY 2017
 

Construction

FY 2018

 

S354-026-1.53 00
STP-0026(055)D
County Road 26: Resurfacing from the junction of CR 24 to the junction of US 50 (4.69 miles).
$530,000
Construction
FY 2017
       
U354-VIENN-2 00
TAP-2016(326)DTC
Design sidewalk along Grand Central Avenue between 30th Street and 34th Street in Vienna. The Streetscape plan will include decorative lampposts, benches, new curbing, removal and replacement of sidewalks, concrete work, brick pavers, landscaping and topsoil.
 
$75,000

Engineering

FY 2017
S354-77-169.68 00
NHPP-077(347)D
Resurfacing project on I-77 beginning at milepost 169.68 for 3.22 miles north. From Mineral Wells interchange to Staunton Avenue Interchange.
 
$1,250,000
Construction
FY 2017
U354-WOOD-1 00
TAP-2016(322)DTC
Pike Street Trail: Design path along WV 14 – Project to consist of design work for building a 7-foot-wide shared use paved shoulder adjacent to WV 14 from milepost 10.15 (near Kohl’s entrance) to milepost 10.79 (near south end of Rendor Lanes parking lot).
 
$8,000

Engineering

FY 2017
S354-50-4.95 00
NHPP-0050(359)D
US 50: Resurface 4.36 miles from the CR 9 (Marrtown Road) overpass to the junction of WV 618 (7th Street).
 
$1,350,000
Construction
FY 2017
S354-50-17.17 00
NHPP-0050(358)D
US 50: Resurface 1.83 miles from 0.75 miles east of the junction of CR 26 (Dallison) to 0.19 miles west of the junction of CR 50/35 (Deerwalk).
 
$1,150,000
Construction
FY 2017
D354-14-1 00
ACST-0014(167)D
WV 14 (Pike Street): Resurface 1.35 miles from the junction of WV 14 alt. to the Junction of WV 95.
 
$428,000
Construction
FY 2018
U354-PARKE-14 00
TAP-2016(311)DTC
TAP-2016(312)DTC
Gihon Elementary School Sidewalk – Design and construct approximately 1,040 linear feet of ADA compliant sidewalk along the south side of Gihon Road between Hugh Street and David Lee Drive.
 
$81,150

Engineering
$20,230
Construction
$60,920

 

Engineering

FY 2018
 

Construction

FY 2019

Ohio New TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

PID 95320
WAS-Marietta River Trail-Phase 5

Extension of the Marietta River Trail Phase 5 bike/ped path approximately 0.83 miles beginning at Jefferson Street and ending at Cogswell Lane. Includes a new bridge over Duck Creek downstream from the existing trail.

$2,497,707

 

Engineering

FY 2017
                                    Construction
FY 2019

Engineering cost in Fiscal Year 2017 has been increased from $66,000 to $207,000 for additional Detail Design work.
 


 

 

The following amendments to the 2016-2019 Transportation Improvement Program were made following a phone vote of the WWW Board on January 24, 2017.

 

West Virginia New TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

MOVTA
Section 5307

Install bicycle shelters, repair stations and lockers at various locations within three miles of existing routes. Locations to be determined in consultation with the cities of Parkersburg and Vienna.
 
$37,089

($29,671 Federal
and $7,418 Local)
 
FY 2017

 

MOVTA
Section 5339
Purchase two replacement buses. $293,600

($234,900 Federal and $58,700 Local)
 
FY 2019
MOVTA
Section 5339
Purchase three replacement buses (This project revises an existing project from one bus replacement to three bus replacements.).
 
$397,770

($318,216 Federal and $79,554 Local)
FY 2017

 

The following amendments to the 2016-2019 Transportation Improvement Program were made following a meeting of the WWW Board on December 21, 2016.
 

West Virginia New TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

MOVTA

Section 5339

Purchase and install security cameras at the transit terminal.
 
$24,000
 
The project was originally programmed in FY 2016 using FTA Section 5339 funds ($24,000). The project is being deleted and moved to FY 2017 using 100% local funding. The project cost is being increased to $85,000 and added to the illustrative listing of projects for information purposes. 

 

Ohio New TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

PID 99479

WAS-SR 676-24.00

Landslide repair on WAS-SR 676-24.00. Work includes upgrading storm water drainage system, sidewalks, curb and gutter, as well as upgrading guardrail and resurfacing.
 

$1,210,184

 

Detail Design

FY 2018
                                    Construction
FY 2019

Detail Design was added to the project in Fiscal Year 2018 ($60,000 MPO STP). The MPO funded portion for construction was reduced from $312,000 to $252,000 to cover the Detail Design in FY 2018.
 

PID 95320

WAS-Marietta River Trail-Phase 5

Extension of the Marietta River Trail Bike/pedestrian path approximately 0.83 miles beginning at Jefferson Street and ending at Cogswell Lane. Includes a new bridge over Duck Creek downstream of the existing trail. Cost increased from $1,842,000 to $2,498,707 Construction
FY 2019

Construction moved from FY 2018 to FY 2019. Transportation Alternative Program funds (enhancement) was added to the project in FY 2019 ($1,354,808).
 

 

The following amendments to the 2016-2019 Transportation Improvement Program were made following a meeting of the WWW Board on September 28, 2016.
 

West Virginia New TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

U383-NORTH-1 00

NRT-2015(242)D

North Bend Rail Trail: Install comfort stations (restrooms) one location in Wood County.
 
$38,200

Construction

FY 2017

U354-MOUNT-2 00
NRT-2015(248)D
Mountwood Park: ATV Trail - project includes trail improvements and rest area.
 
$124,362

Construction

FY 2017

X354-D-7.00 12

NHPP-0282(145)D

US 50: Corridor D - seeding, mulching, and bank stabilization from WV 47 to the Blennerhassett Bridge.
 
$2,400,000

Construction

FY 2017
 

S354-21-????

STP-0021(???)

CR 21 – Limestone Hill slide repair #2.
 
$140,000 Project being deleted from the TIP. Will be a State funded project in FY 2016.
 
U354-077-169.16 00
NHPP-0773(458)D
NHPP-0773(459)D
I-77: Race Track Bridge over CR 21/21. Replace bridge at existing location.

Engineering

$50,000

 

Construction

$1,500,000

Project being deleted from TIP. No longer using Federal funds. To be funded with State funds.
 
S354-95-000.00 00
STP-0095(071)D
WV 95: Resurfacing 2.9 miles of WV 95 from the WV 68.
 
$1,500,000 Project being deleted from TIP.

WV TIP Projects (Administrative Adjustments)

Project #

Project Description

Total Project Cost

Schedule

S354-77-173.73 00
ACNH-0773(462)D
I-77: Little Kanawha River Bridge at mile post 173.3  (0.5) miles north of WV 95. Bridge repairs including sealing bridge deck and expansion joints.

 

New project cost

$477,869
($382,295-Federal)

 
S354-47-0.60 00
STP-0047(056)D
WV 47: Resurface 1.72 miles from Worthington Creek Bridge to CR 47/1 (Dry Run Road).
 
New project cost - $741,554 ($593,243 - Federal)

Project moved from FY 16 to FY 17.
 
U354-95-000.00 00
STHS-0095(070)D
WV 95: Resurfacing (1.5”) with the addition of a left  turn lane from Larkmead Road to Division Street. Change in federal project number from STHS-0095(070)D to STP-0095(070)D. Project moved from FY 16 to FY 17.
 
S354-14-3.41 00
ACST-0014(164)D
WV 14: Resurface 2.93 miles through Mineral Wells from 0.10 miles north of CR 14/5 to 0.12 miles south of CR 14/1.
 
Project moved from FY 2016 to FY 2017 and added Federal funds ($680,000).
S354-2-24.27 00
ACST-0002(562)D
WV 2: Resurfacing project from just north of CR 3/8 to just south of CR 2/20. 5.29 miles from Valley Mills to near the Pleasants County Line.
 
Moved project from FY 2016 to FY 2017 and added Federal funds ($340,000).
U354-14-8.69 00
STP-0014(113)D
WV14: Mineral Wells/Pettyville – Construct 4 lanes from 0.10 miles north of CR 21/34 to 0.04 miles north CR 21/15.
 
Funds previously identified in FY 16 for Advanced Construction have been moved into FY 19 and included with the STP allocation. The total Federal share will be $9,280,000.
 
U354-14-28.05 00
CMAQ-0014(149)D
Williamstown: Construct roundabout at the intersection of WV 14 and WV 31 at mile post 28.05.
 
Project moved from FY 16 to FY 18.
S354-618-0.43 00
ACST-0618(001)
WV 618: (Old US 50) – 2.23 miles of resurfacing from WV 68 (Murdoch Ave./Ann St.) to WV 14 Alt. (East  Street).
 
Moved project from FY 16 to FY 18 and included Federal funds ($1,200,000).
S354-618-1.70 00
ACST-618(002)D
WV 618: Resurfacing 1.72 miles of WV 618 from WV  14 (East St.) to US 50.
 
Moved project from FY 16 to FY 18 and included Federal funds ($1,200,000).

 

The following amendments to the 2016-2019 Transportation Improvement Program were made following a meeting of the WWW Board on May 11, 2016.
 

West Virginia New TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

T654-77-186.77 00

NHPP-0773(466)D

I-77: Williamstown-Marietta Bridge six-year bridge inspection.
 
$495,000
 

Engineering

FY 2016

 

T654-14-13.23 00

STP-0014(165)D

WV 14: Fifth Street Bridge six year inspection.
 
$500,000

Engineering

FY 2018

U354-2-27.56 00

HSIP-0002(568)D

HSIP-0002(569)D

HSIP-0002(570)D

WV 2: Install a left turn lane at the junction of WV 2 and CR 2/16.
 
$680,000

Engineering

FY 2016

Right-of-Way

FY 2017

Construction

FY 2017
 

S354-21-????

STP-0021(???)

CR 21 – Limestone Hill slide repair #2.
 
$140,000 Project being deleted from the TIP. Will be a State funded project in FY 2016.
 

Ohio New TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

PID 102950
WAS-CR 60-5.02

Resurfacing project in Adams Township. WAS-CR 60-5.20-6.33.
 

$292,504.

 

Construction

FY 2017


The following amendments to the 2016-2019 Transportation Improvement Program were made following a meeting of the WWW Board on March 16, 2016.
 

West Virginia New TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

S354 -2-24.27 00

ACST-0002(562)D

WV 2 – Resurfacing project from just north of CR 3/8 to just south of CR 2/20, 5.19 miles from Valley Mills to near the Pleasants County line.
 
$425,000
 

Construction

FY 2016

 

S354-618-0.43 00

ACST-0618(001)

WV 618 (Old US 50) - 2.23 miles of resurfacing from the junction of WV 68 (Murdoch Avenue/Ann Street) to the junction of WV 14 Alt. (East Street).
 
$1,500,000

Construction

FY 2016

S354-77-174.28 00

NHPP-0773(465)D

I-77 – Resurface 2.14 miles of I-77 from 0.37 miles north of WV 47 Bridge to US 50 Bridge. (Staunton Avenue interchange to US 50 interchange).
 
$850,000

Construction

FY 2016

S354-14-3.41 00

ACST-0014(164)D

WV 14 – Resurface 2.93 miles of WV 14 through Mineral Wells from 0.10 miles north of CR 14/5 to 0.12 miles south of the CR 14/1 junction.
 
$850,000

Construction

FY 2016

S354-47-0.60 00

ACST-0047(056)D

WV 47 – Resurface 1.72 miles of WV 47 from Worthington Creek Bridge to the junction of CR 47/1(Dry Run).
 
$700,000

Construction

FY 2016

S354-95-0.00 00

STP-0095(071)D

WV 95 – Resurface 2.9 miles of WV 95 from the junction of WV 68 to the junction of WV 14.
 
$1,500,000

Construction

FY 2016

S354-618-1.70 00

ACST-0618(002)D

WV 618 – Resurface 1.72 miles of WV 618 from the junction of WV 14 Alt. (East Street) to the junction of US 50. $1,500,000

Construction

FY 2016

Ohio New TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

PID 99928

WAS-CR 341-0.00

Resurfacing project in Muskingum Township on CR 341 (Masonic Park Road). Project Begins at SR 60. Project length is 1.61 miles.
 

Project cost increased from $206,098 to $301,108. MPO STP funded portion increased from $124,802 to $224,000.

 

Construction

FY 2017

Ohio TIP Projects (Administrative Adjustments)

Project #

Project Description

Total Project Cost

Schedule

PID 97033

WAS-SR 32-9.41

Intersection improvement at two locations in Belpre:


Intersection 1

WAS-32-9.41-9.77/WAS-618-7.00-7.04 (Toll Br./SR 618).

Intersection 2

WAS-32-10.44-10.57/WAS-618-6.18-6.23 (Parkersburg-Belpre Br./SR 618). Work includes signal replacement and mill and fill.
 

Project cost increase from $1,570,000 to $1,616,042.

 

Construction

FY 2016

 

The following amendments to the 2016-2019 Transportation Improvement Program were made following a meeting of the WWW Board on December 16, 2015.
 

West Virginia New TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

S354-47-2.32 00

ACST-0047(054)D

WV 47: Cedar Grove – Stillwell, skip pave from CR 47/1 to 0.04 miles east of
CR 26. Project begins at mile post 2.32.
$300,000
 

Construction

FY 2016

 

Ohio New TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

PID 101746

WAS-Marietta-Resurfacing

Two-lane resurfacing project with some safety counter measures and improvements at the SR 60 (Third Street) and Washington Street intersection, and the SR 60 and Sacra Via intersection. WAS-SR 60-1.32-1.48.
 

$312,500
 

Construction

FY 2018

PID 101743

WAS-CR 2, 3-5.57, 13.19

Resurfacing 7.32 miles of two-lane road beginning at SR 339. WAS-CR 2-5.57, and WAS-CR 3-13.19. Work includes spot base repair, striping, and the removal and replacement of raised pavement markings.
 
$1,185,000

Construction

FY 2019

PID 102092

WAS-Devola-Path

A preliminary engineering study to look at alternatives for selecting a trail location in Devola with a connection to the existing Marietta trail system.
 
$100,000

Preliminary Engineering

FY 2017
 

PID 95320

WAS-Trail-Phase 5

Extension of the Marietta River Trail bike/pedestrian path approximately 0.83 miles beginning at Jefferson Street and ending at Cogswell Lane. Includes a new bridge over Duck Creek downstream of the existing trail.
 

$1,841,946

MPO CMAQ funds increased from $202,000 to $692,268

 

PID 99479

WAS-SR 676-24.00

Landslide repair on WAS-SR 676-24.00. Work includes upgrading storm water drainage system, sidewalks, curb and gutter, as well as upgrading guardrail and resurfacing.
 
$1,149,000 - Construction Phase being added to the project (MPO STP funds $300,000, and $75,000 in Toll Credit)

Construction

FY 2019

 

The following amendments to the 2016-2019 Transportation Improvement Program were made following a meeting of the WWW Board on September 23, 2015.
 

West Virginia New TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

MOVTA
Section 5339

Purchase two mini vans.
 

$83,000 Federal
$20,800 Local
 

FY 2016

 

Ohio New TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

PID 97033

WAS-SR 32-9.41

Intersection improvements at two locations in Belpre. Locations include Memorial Toll Bridge/SR 618 and Parkersburg-Belpre Bridge/SR 618. Work includes signal replacement and mill and fill.
 

$1,685,000
 
Engineering phase being added to the project in Fiscal Year 2016 ($72,529 Federal - HSIP, $8,059 State).

 

PID 99479

WAS-SR 676-24.00

Landslide repair on Was-SR 676-24.00. Work includes upgrading storm water drainage system, sidewalks, curb and gutter, as well as upgrading guardrail and resurfacing.
 
$1,149,000 Engineering Phase being added to the project in Fiscal Year 2016 (STP-MPO - $36,000 and $9,000 - Local).

PID 95320

WAS-Trail-Phase 5

Extension of the Marietta River Trail bike/ped path approximately 0.83 miles beginning at Jefferson Street and ending at Cogswell Lane. Includes a new bridge over Duck Creek downstream of the existing trail.
 
$1,797,635 Engineering phase being added to the project in Fiscal Year 2016
                                                (CMAQ-MPO - $53,000 and $13,000 – Local)
                                                Right-of-Way phase being added to the project in Fiscal Year 2016
                                                (CMAQ-MPO - $62,304 and $15,576 Local)
 

PID 97967

WAS-Marietta-Asset

City of Marietta Asset inventory project. Gather data on roads such as signs, hazards, curves, no passing zones, and guardrails to be loaded into a MS Access database that will link to GIS mapping system.
 
$88,029 Project being moved from Fiscal Year 2015 to Fiscal Year 2016.

 

The following amendments to the 2016-2019 Transportation Improvement Program were made following a phone vote of the WWW Board on August 27, 2015.
 

West Virginia New TIP Projects (Amendments)

Project #

Project Description

Total Project Cost

Schedule

U354-14-24.56 00

ACST-0014(162)D

WV14 – (Hino-Williamstown) Resurfacing project. 0.28 miles north of CR 21/2 to  WV 31.
 

$385,000
 

Construction

FY 2016

 

U354-77-169.16 00
NHPP-0773(459)D
I-77 - Race Track Bridge over CR 21/21. Replace bridges at existing location.
 
$8,209,000

Engineering and Construction

FY 2016

S354-14-00.00 00
ACST-0014(163)D
WV 14 – Resurfacing project from the Wirt County Line to 0.08 miles north of CR 19 (Slate).
 
$160,000

Construction

FY 2016

U354-VIE/NN-1.00 00
TAP-2014(212)DTC
Vienna – Streetscape project along Grand Central Avenue from 25th Street to 30th Street. Includes sidewalk improvements, curbing, decorative lampposts, benches, and landscaping.
 
$159,851

Engineering

FY 2016
                                Construction

FY 2017

S354-77-176.46 00
NHPP-0773(456)D
WV 14 – Mineral Wells/Pettyville – Construct 4 lanes from 0.10 miles north of CR 21/34 to 0.04 miles north of CR 21/15.
 
$11,600,000

(Project currently on the TIP. Being amended to reflect a 150% cost increase.)

Construction

FY 2016

T654-50-1.00 00
NHPP-0050(346)D
US 50 – Blennerhassett Island Bridge – Six year inspection.
 
$700,000 Engineering
FY 2016
S354-77-173.73 00
ACNH-0773(462)D
I-77 – Little Kanawha River Bridge at mile post 173.3 (0.5 miles north of WV 95). Bridge repairs including seal/deck, and expansion joints.
 
$600,000 Construction
FY 2016
T654-31-19.01 00
STP-0031(047)D
WV 31 – Marietta/Williamstown Bridge – Six year inspection.
 
$550,000 Engineering
FY 2017
U354-14-20.56 00
HSIP-0014(161)D
WV 14 – Grand Central Avenue – Install two luminaries at the intersection of WV 14 and CR 14/16.
 
$80,000 Construction
FY 2016
U354-2-25.29 00
HSIP-0002(541)D
WV 2- Construct left turn lane at the intersection of WV 2 and CR 2/20 (Hoagland Road). Construct two way left turn lane from CR 2/20 to WV 31.
 
$1,400,000 Construction
FY 2016